Vantage Successfully Delivers Oversized Project Cargo For Tianyu Phu Tho Waste-To-Energy Plant

Others

Vantage Successfully Delivers Oversized Project Cargo For Tianyu Phu Tho Waste-To-Energy Plant

1  2  3  4  5
0/5 - 0 Bình chọn - 125 Xem

13/08/2025

Vantage Successfully Delivers Oversized Project Cargo For Tianyu Phu Tho Waste-To-Energy Plant
In July 2025, Vantage successfully completed the transportation of oversized and heavy-lift cargo for the Tianyu Phu Tho Waste-to-Energy Plant Project. The operation was executed on schedule through effective coordination among the plant, transport operators, port authorities and customs officials.
 

 
Project Information
  • Commodity: Ventilation system (Axial fan), hopper system (Hopper), crushing equipment (Pressure meter)
  • Largest unit dimensions: 9.6 × 3.625 × 1.705 (cm)/ 18.14 tons
  • Port of Loading (POL): Shanghai, China
  • Port of Discharge (POD): Hai Phong, Vietnam
  • Delivery location: Phu Tho Tianyu Environmental Energy Co., Ltd – Lot 5, Tram Than Hamlet, Phu Ninh District, Phu Tho Province
  • Implementation period: 14/07 – 30/07/2025
  • Scope of work:
    • Cargo transportation
    • Import customs clearance and port charges
    • Door-to-plant delivery



Overcoming Challenges – Ensuring Optimal Schedule

Faced with large-scale cargo and a tight delivery timeline, Vantage developed an optimal transport solution balancing both time and cost, ensuring full compliance with the committed schedule.

The Vantage team closely coordinated every stage – from truck arrangement and documentation handling to cargo lashing and securing – ensuring absolute safety throughout the journey from Hai Phong Port to the plant in Phu Tho.
 


 
Acting as the central coordinator, Vantage successfully connected all relevant stakeholders, including the plant, trucking companies, port operators, and customs authorities, to ensure a seamless, uninterrupted transportation and clearance process, contributing to the on-time and high-quality completion of the delivery.

Vantage Logistics – A Trusted Partner in Energy and Industrial Projects

The execution and on-time completion of the Tianyu Phu Tho Waste-to-Energy Plant Project cargo further reinforces Vantage’s reputation in providing logistics solutions for complex industrial projects in Vietnam and across the ASEAN region.

Vantage Project Cargo – Optimised Transport Solutions for Project Shipments

Vantage specialises in the transportation of oversized and heavy-lift cargo, delivering comprehensive logistics solutions tailored to each project.
  • Route consulting and specialised surveys for over-dimensional and over-weight cargo
  • Provision of specialised equipment and suitable transport vehicles
  • Flexible supply chain management and efficient customs support
  • Multi-modal transport options: sea, road and inland waterway
With an integrated logistics ecosystem comprising warehousing, stevedoring services and an experienced supervision team, Vantage is always ready to meet the diverse needs of project cargo clients.

Contact Vantage Logistics today for optimised Project Cargo solutions that ensure schedule compliance, safety and efficiency for your project logistics!
Go Back
TOP