Successful Transportation of Passenger Boarding Bridges Equipment for T3 Tan Son Nhat Airport Project
04/09/2024
Successful Transportation of Passenger Boarding Bridges Equipment for T3 Tan Son Nhat Airport Project
Vantage Logistics successfully completed the transportation of passenger boarding bridge equipment for the T3 Tan Son Nhat Airport project, one of the upgraded aviation infrastructures in Viet Nam.

Equipment at Shipper warehouse
Project Information:
Cargo handling process
Vantage Logistics Scope of Work: Exwork Singapore to door Tan Son Nhat airport
Shipping time: 07-08/2024

Cargo at Ho Chi Minh Port, Viet Nam
Vantage handled the entire process, from receiving cargo at the shipper's address in Singapore, transporting it to Singapore Port, managing loading operations, and handling port charges. The cargo was shipped by sea from Singapore Port to Ho Chi Minh Port and delivered to Tan Son Nhat Airport.

Cargo at Ho Chi Minh Port, Viet Nam

Cargo in the ship's hold
Although only over 1500CBM of equipment but Vantage full charter a 8500DWT vessel to assure the large space enough for stowage/ lashing/ dunnage operation, protect these sensitive-brand new-PBB units in the most safety way.

MV DK SUNRISE 8500DWT - TWEENDECK VESSEL

Toolbox Meeting
Optimal Collection Solution: Despite the tight timeline, large volume, and the fact that the cargo was stored in two different locations at the shipper’s warehouse, Vantage devised an optimal collection solution to ensure all goods were present at the port before the vessel arrived, thereby avoiding any delays.
Safe and On-Time Delivery: All cargo was transported safely and delivered on time according to the client’s schedule.

Cargo at Tan Son Nhat Airport, Ho Chi Minh City, Viet Nam
Go Back
Vantage Logistics successfully completed the transportation of passenger boarding bridge equipment for the T3 Tan Son Nhat Airport project, one of the upgraded aviation infrastructures in Viet Nam.

Equipment at Shipper warehouse
Project Information:
- Project name: T3 - Tan Son Nhat Airport
- Commodity: Passenger Boarding Bridges
- Volume: 06 units of PBB and Accessories
- Port of Loading (POL): Singapore Port
- Port of Discharge (POD): Ho Chi Minh Port
- Delivery Address: Tan Son Nhat Airport

Cargo handling process
Vantage Logistics Scope of Work: Exwork Singapore to door Tan Son Nhat airport
Shipping time: 07-08/2024

Cargo at Ho Chi Minh Port, Viet Nam
Vantage handled the entire process, from receiving cargo at the shipper's address in Singapore, transporting it to Singapore Port, managing loading operations, and handling port charges. The cargo was shipped by sea from Singapore Port to Ho Chi Minh Port and delivered to Tan Son Nhat Airport.

Cargo at Ho Chi Minh Port, Viet Nam

Cargo in the ship's hold
Although only over 1500CBM of equipment but Vantage full charter a 8500DWT vessel to assure the large space enough for stowage/ lashing/ dunnage operation, protect these sensitive-brand new-PBB units in the most safety way.

MV DK SUNRISE 8500DWT - TWEENDECK VESSEL
Schedule Monitoring: The Vantage team meticulously arranged the transportation schedule, closely monitored the process, and provided daily updates to all parties involved.
Close Coordination: Vantage closely collaborated with the factory, port authorities, ship agents, and vessel owners to ensure the cargo was loaded onto the ship according to the schedule.
Close Coordination: Vantage closely collaborated with the factory, port authorities, ship agents, and vessel owners to ensure the cargo was loaded onto the ship according to the schedule.

Toolbox Meeting
Safe and On-Time Delivery: All cargo was transported safely and delivered on time according to the client’s schedule.

Cargo at Tan Son Nhat Airport, Ho Chi Minh City, Viet Nam