- Project: Deflector Gold Project
- Volume: 6 packages, total volume of 38.1 tons, were loaded into 2*40'OT IG and 2*40'FR OWOH, of which the biggest unit is 11.2mL x 4.658mW x 2.973mH x 9tons
- POL: Hai Phong port, Vietnam- POD: Fremantle Port, Australia
- Vantage’s scope: Trucking from Lilama 69.3 factory to FOB Haiphong port, Customs clearance, port operation.- Shipment time: 08 – 12Jan 2020