Deliver 482 M3 Water Tank to Duong Dong Waterworks
31/07/2014
Duong Dong Waterworks (Phu Quoc Island) upgrade project includes: improving Duong Dong raw water collecting basin; construction of DN 560 pipe system 3.2km length linking from basin to 3,000 m3 reservoir and upgrade grade 1 pumping station; upgrading the waterworks capacity from 5,000 m3 to 16,500 m3 per 24 hours; installing SCADA system to control and monitor the operation of water distribution system; installing 16.5 km length of D350-D400 pipe system, installing V 500 m3 a water tank on the water distribution axis at 41 m height (road 47) to deliver water to long beach and Suoi Lon pressure station to forward water to An Thoi in future.
The V 500 m3 water tank is a product of CST Industries, made of “Glass-fused-to steel” material, with a proof. The main tank and accessories were imported from North America, the roof and accessories were processed in Viet Nam. We cleared customs, received at Ho Chi Minh city port and factory in Bien Hoa, shipped to Phu Quoc island by domestics vessel, safely delivered to project owner at jobsite on 31 July 2014.
Duong Dong Waterworks (Phu Quoc Island) upgrade project includes: improving Duong Dong raw water collecting basin; construction of DN 560 pipe system 3.2km length linking from basin to 3,000 m3 reservoir and upgrade grade 1 pumping station; upgrading the waterworks capacity from 5,000 m3 to 16,500 m3 per 24 hours; installing SCADA system to control and monitor the operation of water distribution system; installing 16.5 km length of D350-D400 pipe system, installing V 500 m3 a water tank on the water distribution axis at 41 m height (road 47) to deliver water to long beach and Suoi Lon pressure station to forward water to An Thoi in future.