A shipment the 4th of oversized equipment (BreakBulk) for the PALU-3 Coal Steam Power Plant project
07/09/2023
A shipment the 4th of oversized equipment (BreakBulk) for the PALU-3 Coal Steam Power Plant project
Vantage Logistics surveyed the sea freight plan for the shipment of the 4th of oversized equipment and accessories (BreakBulk) for the PALU-3 coal-fired steam power plant project.





Go Back
Vantage Logistics surveyed the sea freight plan for the shipment of the 4th of oversized equipment and accessories (BreakBulk) for the PALU-3 coal-fired steam power plant project.

Project information:
Shipment 4th data:
Shipment 4th data:
- Shipment data: Project: PALU-3 COAL-FIRED STEAM POWER PLANT
- Commodity: Part of Stacker Reclaimer
- Volume: 560 PKGS
- Gross Weight: 1,536,319 KGS/ 7,916 CBM
- Vessel capacity of 11,529 DWT
- POL: Masan, Korea
- POD: Pantoloan, Indonesia

- Vantage’s scope: Sea transportation by Break Bulk from Masan to the destination port in Pantoloan, Indonesia.
- Shipment Time: 15th – 30th Apr, 2023




Tags
Palu3 Masan Korea Pantoloan Indonesia Palu3 Masan Korea Pantoloan Indonesia Vantage logistics Project cargo Transportation Overweight Overheight Over length Oversized OOG Machinery Equipment Break bulk Supercargo Oversea Heavy lift Steel structure Cargo handling Trucking Air freight Sea freight Freight forwarder