A shipment the 3rd of oversized equipment and accessories (Break Bulk) for the PALU-3 Coal Steam Power Plant project

Project information:
Shipment 3rd data:
Project: PALU-3 COAL-FIRED STEAM POWER PLANT (2X50 MW)


Vantage’s scope: Sea transportation by Break Bulk from Masan, Korea to the destination port in Pantoloan, Indonesia.

Vantage Logistics proposed and found a suitable vessel to transport oversized equipment. And coordinate with related parties are factories, shipping agents, Ship owners, and Charterers in Masan, Korea. Ensure cargo s are delivered on time.

Go Back
A shipment the 3rd of oversized equipment and accessories (Break Bulk) for the PALU-3 Coal Steam Power Plant project

Project information:
Shipment 3rd data:
Project: PALU-3 COAL-FIRED STEAM POWER PLANT (2X50 MW)

- Commodity: Part of the Stacker Reclaimer
- Volume: 310 PKGS
- Gross Weight: 618,629 KGS/ 3,153 CBM/ vessel capacity of 11,968 DWT
- POL: Masan, Korea
- POD: Pantoloan, Indonesia
- Shipment Time: 20th Dec 2022- 03rd Jan 2023


Vantage’s scope: Sea transportation by Break Bulk from Masan, Korea to the destination port in Pantoloan, Indonesia.