- Project name: Big C Nha Trang project

- Commodity: PV module, male & female connector

- Volume: 04X40'HC, total weight 66.5 tons (252.6CBM)

- POL: Shanghai port, China

- POD: Cat Lai port, HCMC, Vietnam

- Vantage’s scope: Ocean Freight, Custom Clearance, Local charge, Port charge, Trucking

- Shipment time: 25 Feb to 26 Mar 2021

During the stressful period of the shipping industry due to the shortage of containers and spaces, Vantage was still able to arrange available empty containers and spaces, as well as apply for inland transport permit and delivered the goods to assigned destination as scheduled.